Black Friday Sale + Spend $500 or more get FREE SHIPPING! Ends 12/03/24! Call or chat today! Large Project? Request a Quote.
  • HDI - One Component Top Coat - Quart

HDI - One Component Top Coat - Quart

This is for a quart of HDI which covers, 100 to 200 sq ft. HDI will covers 400-800 sq. ft. per gallon @ 2-4 mils. SPE-HDI is a one component moisture cured polyurethane (HDI based) floor coating/sealer that exhibits superior characteristics for abras ...
  • $52.25

  • $68.33

This is for a quart of HDI which covers, 100 to 200 sq ft. HDI will covers 400-800 sq. ft. per gallon @ 2-4 mils. SPE-HDI is a one component moisture cured polyurethane (HDI based) floor coating/sealer that exhibits superior characteristics for abrasion resistance and chemical resistance.  This product has good UV stability.

Recommended for showrooms, warehouses, laboratories, cafeterias, and most indoor chemical exposure areas with regard to concrete or cement.  IMPORTANT TO NOTE: If you live in an area with low humidity we do not recommend HDI.

LIMITATIONS:  
* Clarity of color may be affected by high humidity, low temperatures, chemical exposure or exposure to lighting such as sodium vapor lights. 
* For best results use a high quality 3/8” nap roller. 
* Slab on grade requires moisture barrier. 
* Substrate temperature must be 5°F above dew point.
* All new concrete must be cured for at least 30 days. 
* Use a suitable primer - HD WB, HD PRO, HD PRO XL 
* If recoating after 24 hours, then the surface must be deglossed before the application. 
* The concrete and joints must be thoroughly dry prior to application. 
* Applying the product thicker than recommended may result in product failure. 
* Applications in direct sunlight, high humidity or high temperatures may cause surface curing before suitable air release has occurred. 
* Physical properties are typical values and not specifications. 


CURE SCHEDULE: (70°F)
pot life – (1 gallon volume)…………………..……...…...…..3- 5 hours
tack free (dry to touch)………………..………………………4-7 hours
recoat or topcoat.....………………..…....................................9-13 hours
light foot traffic...……………..…………………............…13-24 hours
full cure (heavy traffic)... …...…………..……………...….......3-5 days

  • 0%
  • 0%
  • 0%
  • 0%
  • 0%

Reviews Over HDI - One Component Top Coat - Quart

Total Reviews (0)
click here write review to add review for this product.